i just spent 12 hours a day, for 8 days, drilling a water well next to a fish pond, and all i could do was work and watch other people fish haha! terrible predicament!
jim, i ate my lunch on the fly haha, no breaks! jmichael, it should not have taken us 8 days, but everything was freezing on the night crews shift. it was a real pain. but we drilled a pilot hole, then the final bore. the pilot was 7 3/4, the final bore hole was 12 1/2 250 foot deep. also our rig was made in 84 so it breaks a lot.